Ethiopia Habitat Build Site 3

Addis Ababa, Ethiopia – 2014. Build site number three was a two unit toilet built in a very small space. Both teams worked on this site. The “B” Team did the rebar work and poured the floor slab and the “A” team did the walls. The work was very difficult because of the confined space.
Pouring the floor slab
Mixing concrete
The lane leading to site No. 3
The entrance to site No. 3
One of the locals who will have access to this toilet. He was a great help with the construction
One of the locals who will have access to this toilet. She helped with the work and provided food and coffee every day.
Trying to figure out the layout of the walls. It took three tries to get the centre wall correct
The lane outside site No. 3
Day four
Day four
Almost finished the block work
A plaque to commemorate our work